İpek — Production and Warehouse Facility
Parallel commissioning of a wet sprinkler system and a fire hydrant network for a furniture production facility and raw material warehouse carrying a high fire load.
- Client
- İpek
- Location
- Kayseri, Türkiye
- Industry
- Furniture & Manufacturing
- Year
- 2023

Project Scope
Work items delivered on a turnkey basis.
- Risk analysis and engineering design
- Sprinkler main and distribution lines
- Perimeter fire hydrant network
- Fire department approval & commissioning
Challenge
Furniture manufacturing falls into a hazard class with a high combustible load; in addition, the facility sits in an organized industrial zone where outdoor vehicle movement is heavy, so hydrant access points required careful planning.
Solution
The interior wet sprinkler line was sized with high-hazard-class parameters. The perimeter fire hydrant network was positioned to preserve vehicle movement axes, and each hydrant was delivered with a standard field cabinet. Fire hose cabinets were planned at even intervals along the production lines, with coverage calculated for a 30 m hose per cabinet.
Outcome
The entire system was put into service with fire department approval. For insurance purposes, the protection class was documented above the standard, and the system's continuity is secured under a contracted maintenance agreement.
Systems Used
The main suppression systems integrated in this project.
Let's map your facility's fire protection together.
Free site survey, hydraulic analysis and a fast quote. Our team can be on your site within 48 hours.