Piyano — Production Campus
Full-scope fire protection infrastructure for a large-scale production campus; sprinkler, fire hydrant, and mechanical systems were commissioned turnkey from a single source.
- Client
- Piyano
- Location
- Kayseri, Türkiye
- Industry
- Furniture & Industrial Manufacturing
- Year
- 2024

Project Scope
Work items delivered on a turnkey basis.
- Engineering design & consulting
- Fire hydrant network
- Fire pump set and water tank
- Field installation & commissioning
Challenge
A production and warehouse area exceeding 5,000 m² required perimeter fire hydrant protection and the interior sprinkler network to operate simultaneously. The infrastructure also had to be designed to accommodate future campus expansion.
Solution
A DN150 HDPE fire hydrant network was designed outdoors at a buried depth of 100 cm, keeping hydrant spacing in line with the hazard class. Indoors, a wet sprinkler line dedicated to production and raw material storage was installed together with compressed-air-assisted dry sprinkler zones. The fire pump set was configured with a diesel pump backup that starts automatically even during power outages.
Outcome
A protection infrastructure was created that can be monitored from a single point across the campus and is ready to scale. A periodic maintenance contract secures the operational continuity of the system.
Systems Used
The main suppression systems integrated in this project.
Let's map your facility's fire protection together.
Free site survey, hydraulic analysis and a fast quote. Our team can be on your site within 48 hours.