Comprehensive protection at the Doruk Kağıt 2, 3, and 4 facilities with sprinklers, fire hose cabinets, fire hydrants, and evacuation systems.
- Client
- Doruk Kağıt
- Industry
- Packaging & Paper

Our fire protection approach on the Doruk Kağıt project
In paper production, raw material and finished roll warehouses hold large volumes of tall-stacked material, making them the sections of the facility with the highest fire load. The tight, wide structure of roll stacks can let a fire smolder internally for a long time and make outside response difficult. This characteristic means automatic suppression plays a more decisive role than manual response in large paper warehouses.
At the Doruk Kağıt 2, 3, and 4 facilities, comprehensive protection work was carried out against the fire load from paper production and storage. The sprinkler installation provides automatic response across large production areas, while fire hose cabinets and the hydrant network form the supporting response infrastructure. A tank-and-pump set, smoke venting systems, early detection, and emergency exit solutions raised the facilities' safety level.
Keeping sprinkler heads in roll storage areas compatible with stack height is inspected regularly under the periodic maintenance contract. Testing the sprinkler system is necessary for the continuity of fire department approval.
Project Scope
Work items delivered turnkey at the Doruk Kağıt facility.
- Sprinkler system and fire hose cabinets
- Fire pump set and water tank
- Fire hydrant line
- Smoke vents
- Fire detection and alarm systems
- Emergency exit signage and evacuation systems
Systems Used
The main suppression systems integrated in this project.
Similar References
See AllEngineering rigor,
backed by field experience.
Fire safety is not a piece of hardware, it is an engineering decision. We make that decision with an experienced team and international standards.
Expert Engineering Team
Our experienced engineers bring technical expertise and field experience to every project.
Turnkey Solutions
From site survey to design, installation to commissioning, the entire process runs from a single source.
International Standards
We design and install every system in line with NFPA, FM and TS EN standards.
Fast Service & Technical Support
Rapid response and lasting technical support whenever you need it.
Let's map your facility's fire protection together.
Free site survey, hydraulic analysis and a fast quote. Our team can be on your site within 48 hours.