Tuğsan Sünger
At Tuğsan Sünger's production facility we installed a response infrastructure of fire hose cabinets, a fire pump set and a water tank.
- Client
- Tuğsan Sünger
- Industry
- Furniture & Wood

Our fire protection approach on the Tuğsan Sünger project
In foam manufacturing, shaping PU foam through a chemical reaction is a process that can produce high temperatures and combustible vapor on the production line. When this material ignites it burns extremely fast and gives off dense smoke that spreads quickly. The production line needs an infrastructure suited to this particular chemical process and capable of fast response.
At the Tuğsan Sünger production facility, an interior fire water infrastructure was installed against this risk. Accessible response points were created throughout the facility with fire hose cabinets, while the water reserve and operating pressure the system needs are provided by the fire water tank and fire pump set. This structure offers early, fast manual response to a possible fire on the foam production line.
The installation was completed with fire department approval, on an installation process planned without disrupting the production schedule. The system is tested regularly under a periodic maintenance contract aligned with BYKHY (Turkish Fire Protection Regulation). The fire hose cabinet system, the first response point on the production line, is a priority in this maintenance program.
Project Scope
Work items delivered turnkey at the Tuğsan Sünger facility.
- Fire hose cabinet system
- Fire pump set and water tank
Similar References
See AllEngineering rigor,
backed by field experience.
Fire safety is not a piece of hardware, it is an engineering decision. We make that decision with an experienced team and international standards.
Expert Engineering Team
Our experienced engineers bring technical expertise and field experience to every project.
Turnkey Solutions
From site survey to design, installation to commissioning, the entire process runs from a single source.
International Standards
We design and install every system in line with NFPA, FM and TS EN standards.
Fast Service & Technical Support
Rapid response and lasting technical support whenever you need it.
Let's map your facility's fire protection together.
Free site survey, hydraulic analysis and a fast quote. Our team can be on your site within 48 hours.